Sinta

Indonesia
Select Country
Select country
Search Country by Name

Journal Profile

JIME (Journal Of Industrial And Manufacture Engineering)
eISSN : 25496336 | pISSN :
S5
Sinta Score
0
H-Index
0
H5-Index
0
Citations
0
5 Year Citations
Last Updated :
2019-10-31
2018 2019

Accreditations
Page 1 of 3 | Total Records : 27
Publications Citation
Analisis Perhitungan dan Penentuan Harga Pokok Produksi pada PT. Mutifa Medan Analysis Of Calculation And Determination Of Cost Of Production At PT Mutifa Medan
JF Gulo, K Mustafa, N Siregar
JIME (Journal of Industrial and Manufacture Engineering) 2 (1)
0
Perancangan Fasilitas Kerja yang Ergonomis Pada Stasiun Penyortiran CV Putra Darma
H Haniza
JIME (JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING) 3 (1), 1-13
0
Penerapan Sistem Antrian Pada Stasiun Pengisian Bahan Bakar Umum (SPBU) 14.203. 1165 PT. Kawasan Industri Medan II
YD Polewangi
JIME (JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING) 2 (2), 65-70
0
Analisis Perhitungan Dan Penentuan Harga Pokok Produksi Pada PT. Mutifa Medan
JF Gulo, K Mustafa, N Siregar
JIME (JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING) 2 (1), 12-17
0
Analisis Sistem Perawatan Boiler di PT. Dewa Rencana Perangin-Angin
YD Polewangi
JIME (Journal of Industrial and Manufacture Engineering) 2 (1)
0
Analisa Jaringan Kerja dengan Metode CPM pada Proyek Pembangunan Gedung Balai Diklat BPK RI Perwakilan Provinsi Sumatera Utara di Medan
H Hermanto, K Mustafa, B Banjarnahor
JIME (JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING) 2 (2), 51-56
0
Perencanaan Penjualan Dan Persediaan Optimal Di PT. Interyasa Sedaya Medan
ESU Surbakti, K Mustafa, M Banjarnahor
JIME (JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING) 2 (2), 45-50
0
Optimasi Perencanaan Produksi Sepatu Kulit Dengan Menggunakan Linier Programming
E Yusnita, J Juarni
JIME (JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING) 2 (1), 1-6
0
Peramalan Tingkat Permintaan LPG PT. Pertamina (Persero) Di Elpiji Tandem
J Wijono, N Siregar, M Banjarnahor
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING 2 (2), 35-39
0
Analisis Tingkat Kebisingan terhadap Karyawan di Lingkungan Kerja Kantor PT Surveyor Indonesia Cabang Medan
MF Sahab
Universitas Medan Area
0
Citation Statistics
Best viewed in resolution 1024x768 and higher
SINTA was originally initiated by:

UNISSULA

Universitas Islam Sultan Agung

UAD

Universitas Ahmad Dahlan

UNSRI

Universitas Sriwijaya
The Team:

Imam Much Ibnu Subroto

Universitas Islam Sultan Agung

Tole Sutikno

Universitas Ahmad Dahlan

Deris Stiawan

Universitas Sriwijaya

Ahmad Heryanto

Universitas Sriwijaya

Sam F Chaerul

Universitas Islam Sultan Agung

Herman Yuliansyah

Universitas Ahmad Dahlan